October 15, 2014: Prime has started installing roof at the new FedEx Distribution Warehouse in Londonderry, NH. Project consists of TPO mechanically attached roof system at the main building which is (311,980 sf), a separate free standing vehicle maintenance building which will also get a TPO roof system approx (5,180 sf) and a free standing security building which will receive architectural roof shingles approx (2,500 sf).
Attached is some architectural renderings of what the site will look like.